Funding from the California Transportation Commission will bring Crescent Mills some much-needed rehabilitation. When the Dixie Fire raged through, it wiped out much of the area and devastated the lands. During an August meeting, the CTC allocated an additional 2.2 billion dollars to help repair and improve transportation infrastructure throughout the state. Plumas County was awarded a piece of those funds for the crescent mills project. From Indian Falls Road to south of Hot springs road and from mill street to north of mills street, the roadways pavement will be rehabilitated, guard rails updated, and signage improved. Drainage systems will also get installed along with the construction of a vehicle pullout. Other area projects included with these funds are in Modoc County, to improve drainage by repairing or replacing culverts to reduce and prevent flooding, as well as near Burney to pave roadways, upgrade guardrails, and reconstruct sidewalks that are ADA compliant.
Follow Us on Facebook
Latest Local News
Interior Department rolls out one dollar, one tree holiday savings on public lands
The Department of the Interior today announced a holiday... Read More.
Sacc Anthony Pedroza Arraigned for Double Murder and Assault Weapon Charges in Lassen County
Lassen County District Attorney issued the following Press Release.
SACC... Read More.
Arrest Made for Highway 395 Shooting
Police have arrested a man accused of killing two... Read More.
City of Portola Snow Removal Guidelines
As the city of Portola prepares for winter weather,... Read More.
Previous
Next
Current Weather
Upcoming Events
Chipper Time Holiday Drive Thru with Santa and Festive Displays
Now - Fri, Dec 19 at 8:00pm
Plumas Sierra fairgrounds






