Loyalton continues to lose “lots of water” as Mayor Jackson commented during the city’s council meeting. The City applied for a grant to cover repairs of the major leak spilling an Olympic-size swimming pool each week but has been denied. Now the city must face the final option to replace 300 feet of 10” line. City consultant Farr West after inspecting the line is suggesting abandoning the line altogether. Additionally, the shut-off valve to the pipe is hiding under a mess of poison hemlock making access difficult with talks of spraying herbicide or contracting out work to remove it with equipment. Assistant Fire Chief Robert DeMartini said he is concerned with how long the water will be shut off during the work. Currently, the well was said to be around 14 feet when the tanks should be holding 17-1/2 to 18 feet. In response to the repairs of the leak, Mayor Jackson says it’s taken “longer than we wanted.” Work on the line is expected though to start by the end of this month or the first of September.
You Might Also Like These...
Santa Tracker
Loading advertisement…
Follow Us on Facebook
Latest Local News
Join City Manager and Supervisor for Community Town Hall in Portola July 29
Town Hall- One week from today!
All are welcome to... Read More.
Lassen County Junior Livestock Auction Raises Over 382000 Supporting 4H FFA Youth
37 Market Lambs 4 Market Duck Pens 4... Read More.
Previous
Next
Current Weather
Upcoming Events
Plumas Sierra County Fair
Thu, Jul 23 at 11:00am
Quincy, CA
Free Vaccination and Resource Event for School-Age Children at Herlong High School July 24 2026
Fri, Jul 24 at 8:00am
Herlong, CA
Doyle Days
Sat, Jul 25 at 10:30am
Doyle, CA
Plumas-Sierra County Fair Cattlemen’s Barbeque
Sat, Jul 25 at 4:00pm
Plumas-Sierra Fairgrounds


